Archive for December, 2009

Boozin it up

Beings I have to have all the wiring run to get my rough in inspection done, that meant accelerating the bar room. When we last left it, I only had half of one wall drylocked. I’ll say that that stuff will keep in the big 5 gallon bucket for a pretty long time! It has [...]

Shocking, I know…

Been a while since I’ve updated, but I’ve been busy while silent.   Shortly after getting the insulation mostly in, I obtained an estimate to have the subpanel and all circuits done.  What started out as a plan do do ONLY the theater room has now been transformed into finishing the theater and the two [...]